GROW TENTCLOUDLAB 642 (48x24x72 in)
Grow Tents · Rev v1
OFFICIAL MANUFACTURER SPECPut two or three manufacturer-verified models side by side. Normalize units, identify missing specifications, and compare the measurements that matter to your space.

CLOUDLAB 844 vs Gorilla 4×4 vs Mars Hydro 2×4
Comparison HubSpider Farmer SE5000 vs G3000 vs Mars Hydro FC-E3000
Comparison HubAC Infinity CLOUDLINE T4 vs T6 vs T8
Comparison HubPhresh 6×16 in vs TerraBloom 6×24 in vs AC Infinity 4 in
Comparing 3 source-verified records in METRIC units. Missing manufacturer fields remain explicitly labeled Unknown.
| Specification field | ![]() AC Infinity CLOUDLAB 642 (48x24x72 in)AC Infinity Inc. (2026-11-15) | ![]() Gorilla Grow Tent GGT 4x4 Standard (48x48x83 in)Gorilla Grow Tent (2026-11-15) | ![]() Mars Hydro 120x60x180cm Indoor Tent (48x24x71 in)Mars Hydro Official (2026-11-15) |
|---|---|---|---|
Exterior Width width_cm | 121.9 cmOfficial manufacturer spec · AC Infinity Inc. | 121.9 cm | 120 cm |
Exterior Depth depth_cm | 61 cm | 121.9 cm | 60 cm |
Exterior Height height_cm | 182.9 cm | 210.8 cm | 180 cm |
Canvas Density canvas_density_d | 2000 D | 1680 D | 1680 D |
Frame Pole Diameter frame_pole_diameter_mm | 22 mm | 22 mm | Unknown — Not published by manufacturer |
Max Hanging Roof Load max_roof_load_kg | 68 kg | 136 kg | 50 kg |
GROW TENTGrow Tents · Rev v1
OFFICIAL MANUFACTURER SPEC
GROW TENTGrow Tents · Rev v1
OFFICIAL MANUFACTURER SPEC
GROW TENTGrow Tents · Rev v1
OFFICIAL MANUFACTURER SPEC
GROW TENTGrow Tents · Rev v1
OFFICIAL MANUFACTURER SPEC
GROW TENTGrow Tents · Rev v1
OFFICIAL MANUFACTURER SPEC
GROW TENTGrow Tents · Rev v1
OFFICIAL MANUFACTURER SPECSelect 2–3 products to compare side by side in the specification matrix.
Jump to comparison matrixThe purpose of a comparison is to inform the next decision—not to rank products with synthetic stars.
Start with two or three items from the same product family.
Compare width, height, power and airflow in metric or imperial units.
See primary manufacturer documentation and verification dates.
Treat unpublished specifications as explicit gaps, never estimates.
Move from your shortlist into a physical layout and validate clearances, hanging space and electrical load in the 2D planner.
